University of Washington

SJRRP Restoration Allocation Management

SJRRP Restoration Queries

View:

Allocation Inventory

SJRRP Restoration Year 2026 Restoration Flow Volumes

The Bureau of Reclamation provides an allocation of water that is dedicated for in-stream use in fulfillment of the Settlement. This Restoration Allocation is based upon the forecast of natural runoff upstream of Friant Dam. The Restoration Allocation is first made in January and updated regularly through May or June when it is finalized. Releases from Friant Dam for fish and wildlife purposes are called Restoration Flows. These flows are tracked and protected from unauthorized diversion as they make their way downriver to the Sacramento–San Joaquin Delta.

The pattern and rate of Restoration Flows are scheduled by an independent Restoration Administrator, who may also draw upon “Buffer Flows” or acquire water to augment the Restoration Allocation. Any volume of the Restoration Allocation which cannot be released from Friant Dam due to downstream channel capacity limitations becomes Unreleased Restoration Flows that Reclamation may sell or exchange with proceeds benefiting restoration actions.

stacked bar chart allocation inventory

Allocation Distribution

SJRRP Restoration Year 2026 Restoration Flow Volumes

Exhibit B of the Settlement provides a default schedule of Restoration Flows. However, the Restoration Administrator may change the timing and pattern of releases to best benefit fish within certain conditions. The Settlement generally calls for the majority of water to be released from Friant Dam in March and April, with a lower baseflow throughout the remaining months and a small pulse flow in November. In “wet” year types spring flows extend into May, June, and July to facilitate riparian vegetation establishment and growth. In “dry” or “critical-high” year types, Restoration Flows are reduced such that the San Joaquin River may only flow continuously during the spring months. No Restoration Flows are released from Friant Dam in “critical-low” year types although Friant Dam releases some flow in all years to satisfy holding contracts between Friant Dam and Gravelly Ford. Restoration Flows are accounted for at Gravelly Ford, 38 miles downstream of Friant Dam.

The Restoration Allocation should be expended between March 1 and February 28/29 either as river releases or Unreleased Restoration Flows (URF) and cannot be carried over into the next “Restoration Year” (RY). The Restoration Administrator also has the option of advancing releases into the month of February (i.e. releasing Restoration Flows one month earlier overlapping the previous “Restoration Year”).

Monthly Distribution Figure

bar chart monthly allocation

Accumulated Distribution Figure

bar chart accumulated monthly allocation

Tables

Allocation Inventory

SJRRP Restoration Year 2026 Flow Volumes. Restoration Allocation Inventory
Restoration Year Metric Value Unit SJRRP Operations Spreadsheed Date
2026Water Year TypeNormal-Wet 2026/03/06
2026Restoration Allocation310,253AF2026/03/06
2026Date of Allocation2026/02/20 2026/03/06
2026Acquired Water Volume Planned0AF2026/03/06
2026Acquired Water Volume Used0AF2026/03/06
2026Buffer Flows Planned0AF2026/03/06
2026Buffer Flows Used0AF2026/03/06
2026Date of Most Recent Data2026/03/06 2026/03/06
2026URF Removed from Allocation0AF2026/03/06
2026Restoration Flows Released Passing GRF3,709AF2026/03/06
2026Restoration Flows Planned to be released218,331AF2026/03/06
2026Date of Restoration Year End2027/02/28 2026/03/06
2026Net Balance at Year's End88,213AF2026/03/06

Allocation Distribution Monthly

SJRRP Restoration Year 2026 Flow Volumes. Restoration Allocation Distribution. Gravelly Ford, Monthly Volume
SJRRP Operations Spreadsheed Date Restoration Year Restoration Month Display Type RY Restoration Flows at Gravelly Ford Planned RY Restoration Flows at Gravelly Ford Unreleased Restoration Flows Removed from Allocation Exhibit B Restoration Flows at Gravelly Ford
VolumeUnit VolumeUnit VolumeUnit VolumeUnit
2026/03/062026Advanced into FebruaryMonthly Sum0AF0AF0AFNAAF
2026/03/062026MarchMonthly Sum3,709AF37,021AF0AF54,486AF
2026/03/062026AprilMonthly Sum0AF44,271AF0AF137,812AF
2026/03/062026MayMonthly Sum0AF24,020AF0AF9,838AF
2026/03/062026JuneMonthly Sum0AF9,521AF0AF9,521AF
2026/03/062026JulyMonthly Sum0AF9,838AF0AF7,379AF
2026/03/062026AugustMonthly Sum0AF9,838AF0AF7,379AF
2026/03/062026SeptemberMonthly Sum0AF9,521AF0AF8,331AF
2026/03/062026OctoberMonthly Sum0AF11,683AF0AF11,683AF
2026/03/062026NovemberMonthly Sum0AF13,686AF0AF20,430AF
2026/03/062026DecemberMonthly Sum0AF19,676AF0AF14,142AF
2026/03/062026JanuaryMonthly Sum0AF15,372AF0AF15,372AF
2026/03/062026FebruaryMonthly Sum0AF13,884AF0AF13,884AF

Allocation Distribution Accumulated

SJRRP Restoration Year 2026 Flow Volumes. Restoration Allocation Distribution. Gravelly Ford, Accumulated Volume
SJRRP Operations Spreadsheed Date Restoration Year Restoration Month Display Type RY Restoration Flows at Gravelly Ford Planned RY Restoration Flows at Gravelly Ford Unreleased Restoration Flows Removed from Allocation Exhibit B Restoration Flows at Gravelly Ford
VolumeUnit VolumeUnit VolumeUnit VolumeUnit
2026/03/062026Advanced into FebruaryAccumulated0AF0AF0AFNAAF
2026/03/062026MarchAccumulated3,709AF37,021AF0AF54,486AF
2026/03/062026AprilAccumulated3,709AF81,293AF0AF192,298AF
2026/03/062026MayAccumulated3,709AF105,312AF0AF202,136AF
2026/03/062026JuneAccumulated3,709AF114,833AF0AF211,656AF
2026/03/062026JulyAccumulated3,709AF124,671AF0AF219,035AF
2026/03/062026AugustAccumulated3,709AF134,509AF0AF226,413AF
2026/03/062026SeptemberAccumulated3,709AF144,030AF0AF234,744AF
2026/03/062026OctoberAccumulated3,709AF155,712AF0AF246,426AF
2026/03/062026NovemberAccumulated3,709AF169,398AF0AF266,856AF
2026/03/062026DecemberAccumulated3,709AF189,074AF0AF280,998AF
2026/03/062026JanuaryAccumulated3,709AF204,446AF0AF296,370AF
2026/03/062026FebruaryAccumulated3,709AF218,331AF0AF310,255AF

Data Notes

  • San Joaquin River Restoration Program website.
  • Restoration Year is from March 1 through end of February the following year.
  • Data extracted from SJRRP Operations spreadsheet provided by USBR.
  • Spreadsheet Date: 2026/03/06.